Landscaping & Masonry Williamson County, Texas

Landscaping & Lawn

Native & Adapted Plants for Williamson County, TX

What survives alkaline clay at pH 8 and full Texas sun — and what turns yellow no matter how well you water it.

Free, no-obligation estimate with an on-site walkthrough. Mon–Thu 8–5, Fri 8–4.

19years in Williamson County
5.0from 322 Google reviews
2trades, one contractor
10communities served

What we do

Chosen for alkaline clay, not for the catalogue.

Most plant failures in Williamson County are not neglect. They are chemistry: our soil is alkaline clay sitting on a limestone shelf, often above pH 7.5, and acid-loving plants cannot pull iron out of it no matter what you do. They yellow between the veins, decline for two seasons and die. Choosing for the soil we have is the whole game.

  • Native and adapted planting plans
  • Plant selection for alkaline clay and full sun
  • Drought-tolerant shrub and perennial beds
  • Ornamental grasses and structural plantings
  • Pollinator and wildlife planting
  • Shade tree selection and placement
  • Replacement of failing non-adapted plants

Why B&B

Built by people who
work this ground.

We plant for pH, not for the tag

Nurseries here sell plenty of stock that cannot handle our soil. Iron chlorosis — yellow leaves with green veins — is the tell, and it is a soil problem, not a fertiliser problem.

Natives that earn their place

Cenizo, blackfoot daisy, damianita, Mexican feathergrass, yaupon holly, agave and live oak all want what this county already has: sun, drainage and very little water once established.

Less water, less feeding, fewer pests

Adapted plants need little fertiliser, resist most local pests and feed native pollinators. That is not an environmental argument, it is a maintenance one.

Designed as a landscape, not a plant list

Natives can look scrubby planted at random. Massed, layered and structured, they look deliberate.

How it works

Three steps, no surprises.

  1. 01 Walkthrough

    We come to the property, look at grade, drainage, soil and sun, and talk through what you want. Free, and there is no obligation.

  2. 02 Written estimate

    A fixed scope and price — materials named, not “stone” in the abstract. You know what is being built before anything is ordered.

  3. 03 Build and final walk

    We build it, clean the site, and walk it with you before we call it finished. Most projects run one to three weeks.

What customers say

19 years building in Williamson County

B&B does a beautiful job!!

I rate them A+++

Brandon and crew were extremely courteous, prompt, and neat

Free estimate

Tell us what you're
picturing out back.

Free, no-obligation estimate with an on-site walkthrough. Mon–Thu 8–5, Fri 8–4.